Nature of Work:
· HDPE pipe installation & welding (DN225-SDR9) & (DN280-SDR5) 14 KM
· Welding, Installation & NDT Testing of Carbon Steel Pipeline DN200 3.2 KM.
· Sand Blasting & Heat Shrink Sleeves installation for Carbon Steel.
· Valves installation and Chamber Fitting works.
· Hydrostatic testing of HDPE & Carbon Steel Pipes.
· Dis-Infection & Flushing.