(EMAR) Dubai Hills Mall Project

Project Details

Contracter:

AE ARMA ELEKTROPANC LLC/ALEC

Date:

January 2019 to January 2020

Nature Of Work:

• Welding and installation of chilled water piping in main building diameter 6” to 32”.
• Hydrostatic test.
• Insulation of pipes.
• Riser pipe installation and welding.

Enter your keyword