(FEWA) 62W – 2014 Transmission pipeline, Ajman

Project Details

Contracter:

Landenberg

Date:

August 2017 to November 2017

Nature Of Work:

• Bolt Torquing and inspection work of valve chambers for DI pipeline diameter 200mm to 700mm.
• Fabrication and installation of steel structural tank support (weight 6 Ton).
• Hydrostatic test of DI pipeline.

Enter your keyword