Ministry of Presidential Affairs Potable Water Line (RAK)

Project Details

Contractor:  FALA Road Contracting LLC

Date:  May 2023 to Date

Nature of  Work:

·   HDPE pipe installation & welding (DN225-SDR9) & (DN280-SDR5) 14 KM
·   Welding, Installation & NDT Testing of Carbon Steel Pipeline DN200 3.2 KM.
·   Sand Blasting & Heat Shrink Sleeves installation for Carbon Steel.
·   Valves installation and Chamber Fitting works.
·   Hydrostatic testing of HDPE & Carbon Steel Pipes.
·   Dis-Infection & Flushing.

Enter your keyword